FreeTrackPlans.com
  • Home
  • Layout Plans
  • Hornby Plans
  • Prototype Plans
  • Wooden Railway
  • Download

Wychway
​
8'x6'

Submitted by Coffers. This plan is partly based on the end to end with continuous loop idea but this one requires a reversal out of the central lower level station in order to travel between the two branch lines.

 I think this could be based in the transition era as one branch terminus has a run around loop, but the other requires a station pilot to extricate a steam train out of the bay platform. Alternatively it could be based post steam with DMU/EMU units operating between stations. The branch stations are based at a higher level than the continuous loops, currently 5" above, which makes for steep climbs from the main loop level (max 7%, I know it's steep). reducing the height to about 4" would reduce the gradients. 

Where do I see this operating, possibly in some imaginary valley in any region with the two branch lines being on opposite sides of the valley. The branch stations could serve rural mining or agricultural communities whilst the mainline valley floor station and freight yards serve to move goods and stock onwards to other destinations.

Picture
Next Plan
Picture
Thankyou for visiting Free Track Plans - the home of model railway track designs and layout plans for your Hornby train set. 
The images and designs on this website must not be copied or reproduced without written consent.
Copyright © 2010 - 2024 FreeTrackPlans.com. All Rights Reserved.
Site powered by Weebly. Managed by JustHostMe Limited
  • Home
  • Layout Plans
  • Hornby Plans
  • Prototype Plans
  • Wooden Railway
  • Download